Workshop
for Work Packages 3
Kick-off Meetings for Work Packages 4 & 5
(25 - 29 May 2002)
Agenda
Tentative
Agenda for Workshops 25-29 November
Nov.
25. : Steering committee meeting 4 and TIP meeting 3
Attendance: Steering committee members, TIP members
Time |
Activity |
Associated
WP |
| |
|
|
0900
- 0915 |
Meet
with coffee |
|
0915
- 1215 |
TIP
committee, incl. coffee/tea break |
9 |
1215
- 1315 |
Lunch |
|
1315
- 1700 |
Steering
Committee meeting, incl. coffee/tea break |
10 |
Nov.
26.: Work package 3 workshop
Attendance: participants in WP3, WP4 and WP5 are requested, open
to all
Time |
Activity |
Associated
WP |
| |
|
|
0900
- 0915 |
Meet
with coffee |
|
0915
- 0945 |
introduction
of objective, requirements, use cases |
3 |
0945
- 1015 |
coffee/tea
break |
|
1015
- 1100 |
presentation
of leading principles |
3 |
1100
- 1130 |
demo
prototyping |
|
1130
- 1230 |
presentation
on misc. topics |
3 |
1230-1330 |
Lunch |
|
1330-1530 |
Open
Forum/discussion |
3 |
1530-1600 |
Coffee/tea
break |
|
1600-1700 |
Discussion
cont’d |
3 |
Nov.
27.: Joint kick-off Work package 4 and 5
Attendance: WP4 and WP5 participants, representatives of WP2, WP3
and WP6
Time |
Activity |
Associated
WP |
| |
|
|
0900
- 0915 |
Meet
with coffee |
|
0915
- 0945 |
introduction
on WP 4 objective, plan |
4
and 5 jointly |
0945
- 1015 |
introduction
on WP 5 objective, plan |
4
and 5 jointly |
1015
- 1045 |
coffee/tea
break |
|
1100
- 1130 |
discussion
- identification of components to be designed by WP4 and WP5 (based
on requirements analysis) |
4
and 5 jointly |
1130
- 1230 |
discussion
- identification which components (within or outside project) may
have potential impact on architecture / interface design |
4
and 5 jointly |
1230-1330 |
Lunch |
|
1330-1500 |
discussion
- allocation of functionality/component designs between WP 4 and WP
5 |
4
and 5 jointly |
1500-1530 |
Coffee/tea
break |
|
1530-1700 |
development
approach:
• similarities and differences between WP 4 and 5
• interaction between WP4 and WP5
• relations with WP6 (prototyping, level of detail)
• design methodology
|
4
and 5 jointly |
Nov.
28.: Parallel session Work package 4 and 5
WP4 attendance: WP4 participants, representatives of WP3
WP5 attendance: WP5 participants, representatives of WP2
Time |
Activity |
Associated
WP |
| |
|
|
| 0900
- 0915 |
Meet
with coffee |
|
|
0915
-1015 |
Task
identification
• based on architecture identify issues and components to be
worked upon |
4 |
Task
identification
• requirements review, allocate requirements to individual tools
• brainstorm on additional functionality of tools
|
5 |
1015
- 1045 |
coffee/tea
break |
|
|
1100
- 1230 |
working
procedures
• identify how work is distributed (if desired allocate issues/components
to various parties)
• determine design methodology
• discuss QA procedure
• define table of contents of design documents
|
4 |
working
procedures
• allocate tools/components to various parties
• determine design methodology
• discuss QA procedure
• define table of contents of design documents
|
5 |
1230-1330 |
Lunch |
|
| 1330-1500
|
produce
relevant questions/points of interest to WP5 |
4 |
| produce
relevant questions/points of interest to WP4 |
5 |
| 1500-1530 |
Coffee/tea
break |
|
| 1530-1700 |
joint
discussion on interrelated issues / points of interests |
4
and 5 jointly |
Nov.
29. Parallel session Work package 4 and 5
WP4 attendance: WP4 participants, representatives of WP3
WP5 attendance: WP5 participants, representatives of WP2
Time |
Activity |
Associated
WP |
| |
|
|
0900
- 0915 |
Meet
with coffee |
|
|
0915
- 1015 |
•
collective brainstorm on various issues identified |
4 |
| •
Individual work on tools, to see if methodology is workable, gain
some experience and obtain hands on clarity of what needs to be done |
5 |
1015
- 1045 |
coffee/tea
break |
|
1100
- 1230
|
•
collective brainstorm on various issues identified |
4 |
| •
Individual work on tools cont’d |
5 |
1230-1330 |
Lunch |
4
and 5 jointly |
1300-1400 |
Synchronise
activities between WP 4 and WP 5 |
|
1400-1500 |
Complete
planning
• Finalise detailed time planning for 2003
• distribution of tasks
• prepare action list
|
4
and 5 separately |
|